United Arab Emirates — hero 1,600 × 500 px slot: country_united-arab-emirates_hero

Sourcing guide for Emirati buyers

Import from India to United Arab Emirates

Current duty position, shipping lanes, payment terms and verified Indian manufacturers across all twenty sourcing categories.

  • Nhava Sheva / Mundra to Jebel Ali. 4–7 days — the shortest lane on the site.

Post your requirementBrowse categories

Duty position: India to United Arab Emirates

Preferential access live

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

India's best-utilised trade agreement by a wide margin. Tariff lines actually used rose from 7,546 in FY22 to 8,053 in FY26, on 4.45 lakh certificates of origin. Bilateral trade has passed US$100 billion for two consecutive years with a US$200 billion target for 2032.

Verified 09-08-2026. Confirm against your own tariff line before committing to a landed cost.

Shipping lane
Nhava Sheva / Mundra to Jebel Ali. 4–7 days — the shortest lane on the site.
Payment terms
Advance or LC. Many Gulf buyers work on 50% advance for first orders.
Trade context
India exported US$37.36 billion to the UAE in FY2025-26. The UAE has overtaken the USA as India's largest gems and jewellery market at US$8.70 billion, up 10.52%.

What Emirati buyers source from India

Twenty categories, each with the duty position for this market, verified suppliers, MOQ and lead times.

925 Silver Jewellery & Findings

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 50–200 pieces per design · 30–45 days

Attar, Itra, Oud & Perfume Oils

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 1–25 kg · 45–60 days

Human Hair, Wigs & Extensions

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 50 pieces · 20–30 days

Handicrafts, Gifts & Home Decor

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 50–200 pieces · 30–45 days

Non-Woven & Technical Textiles

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 500–1,000 kg · 25–40 days

Packaging Materials & Machines

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ Consumables 5,000 pcs · machines 1 unit · 30–50 days

Biodegradable Tableware & Briquettes

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 10,000 pieces / 1 x 20ft · 25–40 days

Marine & Seafood Products

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 1 x 40ft reefer container · 20–35 days

Ayurvedic, Herbal & Wellness

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 3,000–5,000 units · 45–60 days

Pre-Engineered Buildings & PUF Panels

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 1 x 40ft / per project · 35–60 days

Electrical Equipment, Motors & Pumps

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 10–100 units · 30–60 days

Industrial Machinery & Equipment

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 1 unit · 45–90 days

Readymade Garments & Apparel

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 200–500 pieces per style and colour · 35–45 days

Agri Commodities: Rice, Spices & Tea

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 1 x 20ft container · 25–40 days

Gems, Jewellery & Fashion Jewellery

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 50–250 pieces per design · 30–45 days

Building Materials, Panels & Boards

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 1 x 20ft container · 30–45 days

Pharmaceuticals & Medical Disposables

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ By product and registration · 60–120 days

Cotton Yarn, Fabrics & Home Textiles

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 500–2,000 pieces or 1,000 kg · 30–50 days

Auto Components & Spares

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 100–1,000 pieces · 35–60 days

Chemicals, Dyes & Intermediates

Preferential or zero on most lines under the India-UAE CEPA, in force since 01-05-2022.

MOQ 500 kg – 1 x 20ft · 30–50 days

Tell us what you need

Send one requirement. We match it against verified Indian manufacturers and come back with quotations — typically within five to ten working days.

  • Released to a maximum of 5 suppliers, and we publish that cap
  • Every supplier IEC, GST and bank verified before listing
  • Export documentation handled by ZJELL Limited
  • No fee to buyers, ever

Your details are released to a maximum of 5 verified suppliers in this category, and to nobody else. We do not sell buyer data.